• Home
  • About
  • Products
  • Sprint Reviews
  • Sprint Schedule
Sign in Subscribe

Comet

Comet Sprint 26 (Sep 20, 2023 – Oct 3, 2023)

What was the goal of Sprint 26? To continue work on making the bulk ingest process as rock solid as possible. What is the milestone that this sprint is supporting? Ingesting geospatial data and UCSB's ADRL data in bulk. Accomplishments of Sprint 26 The big thing that happened during this
Oct 9, 2023 1 min read
Comet

Comet Workflow Workshop (September 21, 2023)

The Surfliner Project team noticed the need for an in-depth workshop to provide some insights into how Comet’s workflow engine works and can be adapted to new domains. To explore this, we proposed exploring a workflow like digital image capture in a digitalization lab and/or research data to
Sep 26, 2023
Comet

Comet Sprint 25 (Sep 6, 2023 – Sep 19, 2023)

What was the goal of Sprint 25? To make the batch import process as rock solid as possible. Both campuses are very interested in ingesting data into Comet. UCSB is interested in ingesting their ADRL data, and UCSD is interested in supporting geospatial ingest. In general, we are interested in
Sep 25, 2023 1 min read
Shoreline

Comet Shoreline Pipeline MVP - Offcycle Summer 2023

The goal of these two offcycle sprints during the 2023 summer was to get the pipeline for ingesting into Comet and publishing to Shoreline working. We can successfully ingest to Comet and publish to Shoreline!
Sep 6, 2023 2 min read
End of Workcycle

Spring 2023 End-of-Workcycle Update for Stakeholders

End of workcycle review for all products that were on sprint during the Spring 2023 workcycle. For each product, we will answer the following questions and give a high-level stakeholder-focused demo. 1. What was the goal of the workcycle? 2. What were the accomplishments of the workcycle? 3. Did we
Jun 8, 2023

Results of the 2023 Prioritization Exercise - The Lower Priorities

The following are the results of the prioritization exercise on January 18th, 2023. We drew a line about halfway down the list and determined that priorities that were above this line were the higher priorities and the ones below the line were lower priorities. That didn't mean that the lower
Jun 8, 2023 2 min read
Comet

Comet Sprint 24 (May 3, 2023 – May 16, 2023)

What was the goal of Sprint 24? * To complete the work that we had scoped for the new permission structure (Visibility model) for Objects. There are now different levels to choose from, and these permissions are global (i.e they also impact other systems that this object will appear in)
May 18, 2023 1 min read
Comet

Comet Sprint 23 (Apr 19, 2023 – May 2, 2023)

What was the goal of Sprint 23? To continue and complete the critical dependency update work for Comet (Hyrax Ruby 3.2) and to obtain alignment on the baseline stock “Visibility” model for Comet. There is more work to be done to get the Bulkrax Exporter to work, and there
May 4, 2023 1 min read
Comet

Comet Sprint 22 (Apr 5, 2023 – Apr 18, 2023)

What was the goal of Sprint 22? In our last posting, we shared that we wanted to focus our efforts on the Ruby and Rails upgrades for all Surfliner products. The upgrades were completed for Lark, Shoreline, and Starlight, but Comet’s upgrade is still in progress. While there is
Apr 21, 2023 1 min read
Comet

Comet Sprint 21 (Mar 15 - Apr 4, 2023)

What was the goal of Sprint 21? For the first two Surfliner Spring Workcycle sprints, we felt that it was important to work on technical debt and maintenance issues, most especially the Ruby and Rails upgrades for all Surfliner products. For the maintenance tasks, it should be noted that the
Apr 10, 2023 1 min read

Results of the 2023 Prioritization Exercise - The Higher Priorities

The following are the results of the prioritization exercise on January 18th, 2023. We drew a line about halfway down the list and determined that priorities that were above this line were the higher priorities and the ones below the line were lower priorities. That didn't mean that the lower
Feb 22, 2023 4 min read

Prioritization Exercise for 2023

This year, we formalized setting our priorities for the coming year through a "prioritization exercise." On Wednesday, January 18 from 9-11am, we completed a prioritization exercise called 20/20 Vision. An explanation of the exercise can be found at Gamestorming. Step 1 For each Surfliner product we asked the Tech
Feb 22, 2023 2 min read
Comet

Comet Sprint 20 (Dec 2 – Dec 20, 2022)

What was the goal of Sprint 20? The goal of this Sprint was to continue work on batch ingest and export, and tying in ingest through Comet into the geospatial platform, Shoreline. Accomplishments of Sprint 20: * Updated the GBL1.0 to Aardvark JSON converter to meet Shoreline needs * Produced a
Dec 21, 2022 1 min read
Comet

Comet Sprint 19 (Nov 16 – Nov 29, 2022)

What was the goal of Sprint 19? The goal for the overall work cycle is to shore up batch work for ingest and extend it to get batch round trip working so that you can do an export of batch metadata in some format, make changes in the exported format
Dec 9, 2022 2 min read
Comet

Comet Sprint 18 (Nov 3 – Nov 15, 2022)

What was the goal of Sprint 18? The goal for this Sprint (for the overall work cycle) is to shore up batch work for ingest and extend it to get batch round trip working so that you can do an export of batch metadata in some format, make changes in
Nov 17, 2022 1 min read

Summer 2022 End-of-Workcycle Update for Stakeholders (September 7, 2022)

End of workcycle review for all products that were on sprint during the Summer 2022 workcycle. For each product we will answer the following questions and give a high-level stakeholder-focused demo. 1. What was the goal of the workcycle? 2. What were the accomplishments of the workcycle? 3. Did we
Sep 7, 2022
Comet

Comet Sprint 17 (August 3 - August 16, 2022)

What was the goal of Sprint 17? * Pushing collections to the OAI endpoint (tidewater) and making the set harvestable from OAI * IIIF Image Server (Cantaloupe) wired into staging and production environments for each campus * Workflow-driven “publish” from Comet to the Shoreline geodata platform What is the milestone that this sprint
Aug 18, 2022 2 min read
Comet

Comet: Sprint 16 (July 20, 2022 –August 2, 2022)

What was the goal of Sprint 16? * Editing and adding descriptive and other user defined metadata for existing objects * Running workflow and event triggered work (characterization, access derivatives) * Assigning permanent identifiers (primarily interested in the short term in ARKs as canonical IDs) * Publishing that content to a public access platform
Aug 9, 2022 1 min read
Comet

Comet: Sprint 15 (July 6, 2022 - July 19, 2022)

What was the goal of Sprint 15? * Adding/editing descriptive and other user defined metadata * Running workflow and event triggered work (characterization) * Assigning permanent identifiers (ARKs) * Publishing to a public access platform (OAI, IIIF, Shoreline) What is the milestone that this sprint is supporting? To have a robust publish lifecycle
Jul 21, 2022 1 min read
Comet

Comet: Sprint 14 (June 22, 2022 - July 6, 2022)

What was the goal of Sprint 14? * Uploading content singularly and in batch * Editing and adding descriptive and other user defined metadata for existing objects * Running workflow and event triggered work (characterization, access derivatives) * Assigning permanent identifiers (primarily interested in the short term in ARKs as canonical IDs) * Publishing that
Jul 15, 2022 1 min read
Starlight

Starlight: Sprint 13 (April 13- 26, 2022)

What was the goal of Sprint 13? The Surfliner team has been experimenting with regular dedicated off-cycle sprints to focus on maintenance, upgrades, and new features for in-production products such as Starlight (in production since 2019). The goals of Sprint 13 were a combination of all of these things. A
Apr 26, 2022 2 min read
End of Workcycle

Winter 2022 End-of-Workcycle Update for Stakeholders

End of workcycle review for all products that were on sprint during the Winter 2022 workcycle. For each product we will answer the following questions and give a high-level stakeholder-focused demo. 1. What was the goal of the workcycle? 2. What were the accomplishments of the workcycle? 3. Did we
Apr 6, 2022
Shoreline

Shoreline: Sprint 24 (March 2-15, 2022)

(This session was not recorded) What was the goal of Sprint 24? For Sprint 24, the following goals were set: * Determine the formatting of the URL in the CSV to support downloads of original datasets * Continue getting UCLA up to speed on Surfliner devops work * Update Geoserver to 2.19.
Mar 31, 2022 1 min read
Shoreline

Shoreline: Sprint 23 (Feb. 16-Mar. 1, 2022)

(This session was not recorded) What was the goal of Sprint 23? For Sprint 23, the following goals were set: * Research the mechanism for supporting downloads of original datasets * Research the mechanism for supporting the ingest of GeoTIFFs * Provide support for external/standalone Solr instances * Get UCLA up to speed
Mar 31, 2022 1 min read
Comet

Comet: Sprint 13 (March 2, 2022 – March 15, 2022)

Note: This session was not recorded What was the goal of Sprint 13? * Documentation of work done already in the work cycle. Leave things in as clean a state as possible before we break for several months * Set up meetings to address key questions and concerns before we break * Complete
Mar 18, 2022 2 min read
← Newer Posts Page 2 of 5 Older Posts →
© 2025
Powered by Ghost